SPP (Engineering) Home || KSCST Home || Photo gallery || SPP Articles || Close

 

KARNATAKA STATE COUNCIL FOR SCIENCE AND TECHNOLOGY

INDIAN INSTITUTE OF SCIENCE CAMPUS, BANGALORE - 560012

43rd SERIES OF STUDENT PROJECTS PROGRAMME : 2019 - 2020

LIST OF STUDENT PROJECT PROPOSALS APPROVED FOR SPONSORSHIP

 

Note : The sanction order for the project proposals listed below will be dispatched to respective engineering colleges
in the name of Principal and copy to HOD and concerned Guide of the project.

 

Important : Please read the guidelines to carryout the projects.

 

The following are the guidelines to carryout the project work:

a. The project shall be performed based on the objectives of the proposal sent by you.

b. The project shall be completed in all respects and one copy of the hardbound report along with softcopy of the full report (including coverpages, abstract and preliminary pages) in a CD (.pdf format) needs to be submitted to KSCST.


Any change in the project title and objectives, etc., or students is liable to rejection of the project and the amount sanctioned needs to be returned back to KSCST.

c. Every project has been provided with Reference Number. Please quote the project sanctioned reference number in all your future correspondences. Any corrections with respect to the names of the guide and students should be requested at spp@kscst.iisc.ernet.in

d. Important: After completing the project, 2 to 3 page write-up (synopsis needs to be sent, if the project is selected for State-level Seminar and Exhibition during June 2020) needs to be sent via email [spp@kscst.iisc.ernet.in] consisting of the following points:

1. Title of the project

2. Name of the College & Department

3. Name of the Students & Guide(s) (with email id and cell no. if any)

4. Keywords

5. Introduction / background (with specific reference to the project, work done earlier, etc) - about 20 lines

6. Objectives (about 10 lines)

7. Methodology (about 30 lines) (materials, methods, details of work carried out, including drawings, diagrams etc)

8. Results and Conclusions (about 20 lines with specific reference to work carried out)

9. Scope for future work (about 20 lines).

e. Project selected for Seminar and Exhibition will be awarded with certificate.

 

Note: The softcopy of the above said write-up in MS Word format needs to be forwarded to email id (spp@kscst.iisc.ernet.in) through the project guide indicating the project proposal reference number in the subject line.)

 

The sanctioned amount will be sent separately by KSCST to the College in the name of the principal by neft transfer. the details of transaction no. and date will be intimated.

 

  • The sponsored projects evaluation will be held in the Nodal Centre.

  • The Nodal centre will be in one of the engineering college at the regional level.

  • It is mandatory for a sponsored project to demonstrate their project out comings at the nodal centre.

  • The list of nodal centre will be communicated to the Principal of respective engineering colleges and will also be announced in website.

  • The project to be completed in all respects and one copy of the hardbound report along with softcopy
    of the full report in a CD (.pdf format) should be submitted to KSCST.

  • Any change in the project title and objectives, etc., or students is liable to rejection of the project and the
    amount sanctioned needs to be returned back to KSCST.

  • After completion of the project, brief summary (about 2 pages) as per the format indicated
    above (d) needs to be sent via email (
    spp@kscst.iisc.ernet.in).

 

For more details if any, please contact :

Executive Secretary, KSCST

Email: spp@kscst.iisc.ernet.in

or

Mr. K. N. Venkatesh

Program Co-ordinator - SPP

Senior Project Engineer, KSCST

Email: knv@kscst.iisc.ernet.in

 

 

43rd Series of SPP (2019 - 2020)

LIST OF PROJECT PROPOSALS APPROVED FOR
SPONSORSHIP UNDER 43rd Series of SPP

Click here to view sponsored project details (pdf format) ...

 

 

* ~ * ~ *

 

SPP (Engineering) Home || KSCST Home || Photo gallery || SPP Articles ||

Close

This page was updated on : Wednesday, March 11, 2020 10:20 AM